System Manual
WARNING
BEFORE PROCEEDING WITH ANY MAINTENANCE WORK, READ SECTION 1 - HEALTH AND SAFETY
.
VKOKQ
aÉÅçåí~ãáå~íáçå=
Remove any hazardous residues/deposits from the process chamber, precursor delivery lines,
pumps and pump lines, gas lines and mass flow controllers in accordance with local safety
regulations. Refer to equipment manufacturer’s manuals as necessary.
Note that if the system is to be moved and re-installed, it may be acceptable to purge the gas
lines / mass flow controllers and ALD valves with dry nitrogen and seal all connections.
VKOKR
aáëã~åíäáåÖ=íÜÉ=ëóëíÉã=ÅçãéçåÉåíë=
WARNING
LIFTING HEAVY OBJECTS INCORRECTLY CAN CAUSE SEVERE INJURY
When handling heavy system components such as the system unit or vacuum pumps,
ensure that the appropriate lifting equipment, operated by fully trained personnel, is
used.
When heavy rack-mounted components are handled, ensure that the weight is safely
distributed between sufficient personnel.
WARNING
TOPPLING (TIPOVER) HAZARD – SOME SYSTEM COMPONENTS, E.G. ROBOTIC HANDLERS
AND AUTOMATIC LOAD LOCKS / TRANSFER CHAMBERS (ESPECIALLY IF FITTED WITH
CASSETTE LOAD LOCKS) CAN TOPPLE CAUSING SEVERE INJURY.
When transporting or manoeuvring the system frames, robotic handlers etc., ensure
that they remain vertical at all times and use the appropriate lifting / handling
equipment.
Ensure that any support frames, supplied with the system, are correctly fitted
whenever the system is transported / manoeuvred or dismantled for service /
maintenance.
It is entirely the user’s responsibility to ensure that all components are supported
safely before and during any transporting, manoeuvring or maintenance operations.
Support frames provided by Oxford Instruments Plasma Technology are not
necessarily adequate for any such operations. The absence of a support frame must
not be taken as an indication that no further precautions need to be made before
such operations are undertaken.
1)
In the grey area, remove the rotary vane pump from its mounting and prepare it for
transport in accordance with the pump manufacturer’s instructions. Refer to the
manufacturer’s literature in Volume 3 of this manual.
2)
Remove the gas pod from its mounting and prepare it for transport.
3)
Prepare the system PC for transport.
4)
Prepare the system frames for transport by disconnecting processing modules from the
transfer chamber (if applicable) and fitting the castor assemblies.
Uninstallation and Disposal
Issue 1: February 00
Page 9-4 of 6
Printed: 7-Oct-07, 12:11