ELECTRIC POWER CABLE CONNECTION PROCESS
1.
Install a main electric power switch on the (B+) side (
See specifications of
length between battery and switch
)
From the main electric power switch:
2.
Install a separate (B+) power supply cable to the starter motor
(See layout and specifications of the cables in the picture below).
3.
Install a separate (B+) to the fuse box.
(See layout and specifications of the cables in the picture below)
.
4.
Prior to installing the ground cable – ensure that the main electric power
switch is disengaged (OFF and ignition key is in the OFF-position.
5.
Install the ground cable to the specified torque on the alternator bracket and
then install the other end to the battery (B-) Ground. Connect a common
ground cable (wire size same as engine battery cables) between negative (–)
terminals on starting batteries.
Summary of Contents for OXE-150 HP
Page 2: ...2 OXE 150 200 HP INSTALLATION MANUAL ...
Page 4: ...4 OXE 150 200 HP INSTALLATION MANUAL ...
Page 8: ...8 OXE 150 200 HP INSTALLATION MANUAL ...
Page 31: ...31 OXE 150 200 HP INSTALLATION MANUAL ELECTRO STEERING WITHOUT JOYSTICK ...
Page 32: ...32 OXE 150 200 HP INSTALLATION MANUAL POWER STEERING SERVO ASSISTED STEERING ...
Page 35: ...35 OXE 150 200 HP INSTALLATION MANUAL G4 SINGLE ENGINE APPLICATIONS ...
Page 36: ...36 OXE 150 200 HP INSTALLATION MANUAL G4 TWIN ENGINE APPLICATION ...
Page 37: ...37 OXE 150 200 HP INSTALLATION MANUAL G4 TRIPPLE ENGINE APPLICATION ...
Page 38: ...38 OXE 150 200 HP INSTALLATION MANUAL G4 QUAD ENGINE APPLICATION ...
Page 49: ...49 OXE 150 200 HP INSTALLATION MANUAL Rear view 1 Fasten and secure wiring with clips 1 ...