
90-0322-AAA
OHG Sub-Unit Installation Instructions
20th Nov 2012
© 2012 Owlstone Ltd
Proprietary and Confidential
Page 9 of 14
Section 7 -
Preparing the RS-485 cable
If the user needs RS-485 communication capability then cabling needs to be prepared as shown below
Firstly, un-wrap & un-strap the spare cables.
Next remove the “bridge” or “plug” to leave the 15-way connector ready to connect to the OHG.
Figure 13: RS-485 cables as supplied
Figure 14: Re
move “bridge” or “plug”
Figure 15: Cable ready to connect to the OHG