
90-0322-AAA
OHG Sub-Unit Installation Instructions
20th Nov 2012
© 2012 Owlstone Ltd
Proprietary and Confidential
Page 10 of 14
Section 8 -
Installing the OHG
Installing the OVG-4 sub-unit follows the procedure described in section 4 in reverse.
1) Mount the OVG-4 sub-unit in the GEN-SYS rack
Figure 16: Mounting an OVG-4 sub-unit
2) Connect quick connect to the rear of the OVG-4 as shown below.
Pushing the valve firmly until a click is heard.
Figure 17: Connect Quick Connect Valve