Attach above the
exposure line.
Exposure Line
64.
Roof
Filler Shingles
are included to cover
roof seams. Starting at the bottom, slide the first
Long Filler Shingle in until flush with other bottom
shingles.
DO NOT ATTACH UNTIL STEP 65.
62.
Lift up, position and attach right side Middle Roof Panel on Rafters as per
Step 58-59.
63.
Lift up, position and attach right side Front Roof Panel on Rafters as per
Step 60.
Roof batten
flush with end
of rafter.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 25
65.
Screw first filler shingle down to rafters
using 1 - 2 1/2” screw per panel (2 in total).
Make sure to screw into both rafter.