3
Table of contents
5 Installing the OTT SVR 100 9
5.1 Criteria for selecting a suitable installation location 9
5.2 Information on supply voltage 11
5.4 Installing the OTT SVR 100 12
5.5 Connecting the OTT SVR 100 to the data logger 16
5.6 Information on using the RS-485 interface 16
6 SDI-12-commands and responses 17
6.1 Overview of standard SDI-12 commands 17
6.2 Advanced SDI-12 commands 20
7 Performing maintenance work 22
9 Information on disposal of old devices 23
Appendix A – Connecting the OTT SVR 100 to OTT netDL
Appendix B – Wall bracket dimensions/mounting hole positions 28
Appendix C – Note on the declaration of conformity 29
Summary of Contents for SVR 100
Page 1: ...English Operating Instructions Surface Velocity Radar OTT SVR 100...
Page 2: ...We reserve the right to make technical improvements...
Page 34: ......
Page 35: ......