SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
3121716
2-3
Table 2-1. Inspection and Maintenance Table
Type
Frequency
Primary
Responsibility
Service
Qualification
Reference
Pre-Start Inspection
Before using each day; or
whenever there’s an Operator change.
User or Operator
User or Operator
Operator and Safety Manual
Pre-Delivery Inspection (See
Note)
Before each sale, lease, or rental delivery.
Owner, Dealer, or User
Qualified JLG Mechanic
Service and Maintenance Manual
and applicable JLG inspection form
Frequent Inspection
(See Note)
In service for 3 months or 150 hours, whichever comes first;
or
Out of service for a period of more than 3 months; or
Purchased used.
Owner, Dealer, or User
Qualified JLG Mechanic
Service and Maintenance Manual
and applicable JLG inspection form
Annual Machine Inspection
(See Note)
Annually, no later than 13 months from the date of prior
inspection.
Owner, Dealer, or User
Factory Trained
Service Technician
(Recommended)
Service and Maintenance Manual
and applicable JLG inspection form
Preventative Maintenance
At intervals as specified in the Service and Maintenance
Manual.
Owner, Dealer, or User
Qualified JLG Mechanic
Service and Maintenance Manual
NOTE:
Inspection forms are available from JLG. Use the Service and Maintenance Manual to perform inspections.
Summary of Contents for JLG E400A Narrow
Page 28: ...SECTION 1 SAFETY PRECAUTIONS 1 14 3121716 NOTES ...
Page 40: ...SECTION 2 USER RESPONSIBILITIES MACHINE PREPARATION AND INSPECTION 2 12 3121716 NOTES ...
Page 58: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 18 3121716 NOTES ...
Page 65: ...SECTION 4 MACHINE OPERATION 3121716 4 7 Figure 4 3 Grade and Side Slopes ...
Page 76: ...SECTION 4 MACHINE OPERATION 4 18 3121716 Figure 4 5 Lifting Chart ...
Page 77: ...SECTION 4 MACHINE OPERATION 3121716 4 19 Figure 4 6 Decal Installation Sheet 1 of 6 ...
Page 78: ...SECTION 4 MACHINE OPERATION 4 20 3121716 Figure 4 7 Decal Installation Sheet 2 of 6 ...
Page 79: ...SECTION 4 MACHINE OPERATION 3121716 4 21 Figure 4 8 Decal Installation Sheet 3 of 6 ...
Page 80: ...SECTION 4 MACHINE OPERATION 4 22 3121716 Figure 4 9 Decal Installation Sheet 4 of 6 ...
Page 81: ...SECTION 4 MACHINE OPERATION 3121716 4 23 Figure 4 10 Decal Installation Sheet 5 of 6 ...
Page 82: ...SECTION 4 MACHINE OPERATION 4 24 3121716 Figure 4 11 Decal Installation Sheet 6 of 6 ...
Page 94: ...SECTION 4 MACHINE OPERATION 4 36 3121716 NOTES ...
Page 98: ...SECTION 5 EMERGENCY PROCEDURES 5 4 3121716 NOTES ...
Page 102: ...SECTION 6 ACCESSORIES 6 4 3121716 NOTES ...
Page 127: ......