SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
3121716
2-1
SECTION 2. USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
2.1
PERSONNEL TRAINING
The aerial platform is a personnel handling device; so it is neces-
sary that it be operated and maintained only by trained person-
nel.
Persons under the influence of drugs or alcohol or who are sub-
ject to seizures, dizziness or loss of physical control must not
operate this machine.
Operator Training
Operator training must cover:
1.
Use and limitations of the controls in the platform and at the
ground, emergency controls and safety systems.
2.
Control labels, instructions, and warnings on the machine.
3.
Rules of the employer and government regulations.
4.
Use of approved fall protection device.
5.
Enough knowledge of the mechanical operation of the
machine to recognize a malfunction or potential malfunc-
tion.
6.
The safest means to operate the machine where overhead
obstructions, other moving equipment, and obstacles,
depressions, holes, or drop-offs exist.
7.
Means to avoid the hazards of unprotected electrical con-
ductors.
8.
Specific job requirements or machine application.
Training Supervision
Training must be done under the supervision of a qualified per-
son in an open area free of obstructions until the trainee has
developed the ability to safely control and operate the machine.
Operator Responsibility
The operator must be instructed that he/she has the responsibil-
ity and authority to shut down the machine in case of a malfunc-
tion or other unsafe condition of either the machine or the job
site.
Summary of Contents for JLG E400A Narrow
Page 28: ...SECTION 1 SAFETY PRECAUTIONS 1 14 3121716 NOTES ...
Page 40: ...SECTION 2 USER RESPONSIBILITIES MACHINE PREPARATION AND INSPECTION 2 12 3121716 NOTES ...
Page 58: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 18 3121716 NOTES ...
Page 65: ...SECTION 4 MACHINE OPERATION 3121716 4 7 Figure 4 3 Grade and Side Slopes ...
Page 76: ...SECTION 4 MACHINE OPERATION 4 18 3121716 Figure 4 5 Lifting Chart ...
Page 77: ...SECTION 4 MACHINE OPERATION 3121716 4 19 Figure 4 6 Decal Installation Sheet 1 of 6 ...
Page 78: ...SECTION 4 MACHINE OPERATION 4 20 3121716 Figure 4 7 Decal Installation Sheet 2 of 6 ...
Page 79: ...SECTION 4 MACHINE OPERATION 3121716 4 21 Figure 4 8 Decal Installation Sheet 3 of 6 ...
Page 80: ...SECTION 4 MACHINE OPERATION 4 22 3121716 Figure 4 9 Decal Installation Sheet 4 of 6 ...
Page 81: ...SECTION 4 MACHINE OPERATION 3121716 4 23 Figure 4 10 Decal Installation Sheet 5 of 6 ...
Page 82: ...SECTION 4 MACHINE OPERATION 4 24 3121716 Figure 4 11 Decal Installation Sheet 6 of 6 ...
Page 94: ...SECTION 4 MACHINE OPERATION 4 36 3121716 NOTES ...
Page 98: ...SECTION 5 EMERGENCY PROCEDURES 5 4 3121716 NOTES ...
Page 102: ...SECTION 6 ACCESSORIES 6 4 3121716 NOTES ...
Page 127: ......