Page 56
Installation and Operation Manual - Stratford II
ENGLISH
APPENDIx 5: OPTIONAL MODERN GRAVITY HOT AIR DISTRIBUTION KIT
INSTALLATION
The kit includes :
− Decorative plate
(A)
− Adjustable frame
(B)
− Heat distribution box
(C)
− Telescoping section
(D)
− Anchor plates
(E)
− All screws are included
Not included in the kit:
− 8" rigid ducting, 26 ga, galvanized steel (if
necessary according to the desired height).
Dimensions of heat distribution box
B
D
E
A
C
5
1
/2
"
141
m
m
2 1/2"
62mm
15 1/8"
383mm
8
1/
2"
215
m
m
1 1/2"
39mm TYP.
32 1/8"
816mm
O
8"
203mm (2)
10
1
/8
"
256m
m
5 3/4"
147mm
12
1
/2
"
316
m
m
35 1/8"
892mm
9"
23
0m
m
Summary of Contents for STRATFORD II OB04007
Page 2: ......
Page 6: ...Page 6 Installation and Operation Manual Stratford II ENGLISH CERTIFICATION PLATE...
Page 71: ......