Smaller Holes for
Connector Bolts
Install (4) Connector Bolts into small holes on Top and Bottom Panels.
(a) Attach Top. (b) Lock Cams by turning clockwise until snug.
Attach Hanging Brackets to Sides using Euroscrews.
(If using Power Drill, set torque to low setting.)
(a) Attach Sides and Verticals to Bottom. (b) Lock Cams by turning clockwise until snug.
freedomRail Garage Assembly Instructions
1 Shelf GOBox
Tools Required
Power Drill
#2 Phillips
Screwdriver
#2 Phillips Driver
Hammer
Step 3: Attach Sides
Lock
Cam
Open
Assembling the 1 Shelf GOBox
Top
Step 2: Install Connector Bolts
Back Edge
Back Edge
Right Side
Left Side
Step 1: Attach Hanging Brackets
Proper Care for an OBox: Use Goo Gone™ or Simple Green® with a rag or putty knife to remove any excess glue or marring that was caused by shipping or assembly.
Over
Contents of Package
Step 4: Attach Top
Top and Bottom
(a) Attach Sides to Bottom. (b) Tighten Cams by turning clockwise until snug.
(a) Attach Top. (b) Tighten Cams by turning clockwise until snug.
1
Left Side
Right Side
Backing
Shelf
Top and Bottom
(20)
Euroscrews
(16) Backing Nails
Connector Bolts
(8)
Hanging
Brackets
(4)
Shelf
Screws
(4)