PREPARE FOR TILING
1.
Apply wall covering according to local
regulations.
2.
Raise the floor according to local regula-
tions to the same level as the bottom of
the bent edge of the Drain Unit flange.
3.
NOTICE
Make sure the surface adjacent
to the Drain Unit is flush with the
flange.
Min. 2%
Form a steep inclination according to lo-
cal regulations (min. 2% inclination) to-
wards the Drain Unit.
4.
Clean the metal flanges of the Drain Unit.
Pre-installation
19