X7-2L Back Panel Connectors and Ports
No.
Cable Port or Expansion Slot
Description
Standby power mode, and the Oracle ILOM
service processor initializes when the AC
power cables are connected to the power
source. System messages might be lost after
60 seconds if the server is not connected to a
terminal, PC, or workstation.
Note -
Oracle ILOM signals a fault on any
installed power supply that is not connected
to an AC power source, since it might
indicate a loss of redundancy.
2
Network management port (NET MGT)
The service processor NET MGT port is
the optional connection to the Oracle ILOM
service processor. The NET MGT port is
configured by default to use Dynamic Host
Configuration Protocol (DHCP). The service
processor NET MGT port uses an RJ-45
cable for a 10/100/1000BASE-T connection.
3
Ethernet ports:
■ NET 0, 10/100/1000BASE-T RJ-45 GbE
port
■ NET 1 and NET 2, 10/25GbE SFP+ ports
■ NET 1 and NET 2, 10GBASE-T RJ-45
GbE ports
The five Gigabit Ethernet (GbE) ports enable
you to connect the system to the network.
Up to 10GbE is supported when using
copper Gigabit Interface Converters
(GBICS); up to 25GbE is supported when
using optical GBICs.
Note -
The 10/25GbE SFP+ ports are the
default network ports for the server. When
using an SFP+ port, network connectivity
is disabled on the 10GBASE-T RJ-45 GbE
ports.
4
USB port
The USB port supports hot-plugging. You
can connect and disconnect a USB cable or a
peripheral device while the server is running
without affecting system operations.
5
Serial management port (SER MGT)
The service processor SER MGT port uses
an RJ-45 cable and terminal (or emulator)
to provide access to the Oracle ILOM
command-line interface (CLI). Using Oracle
ILOM, you can configure it to connect to the
system console.
Note -
This port does not support network
connections.
X7-2L Back Panel Connectors and Ports
The following figure shows the locations of cable connectors and ports on the back of the
Oracle Server X7-2L and the cables and devices that you connect to them.
Connecting Cables and Applying Power
73
Summary of Contents for X7-2
Page 1: ...Oracle Servers X7 2 and X7 2L Installation Guide Part No E72440 03 October 2017 ...
Page 2: ......
Page 10: ...10 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Page 24: ...24 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Page 34: ...34 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Page 38: ...38 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Page 70: ...70 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Page 82: ...82 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Page 118: ...118 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Page 124: ...124 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Page 144: ...144 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...