8
Sun Datacenter InfiniBand Switch 648 Installation Guide • May 2010
■
“Management Cable Requirements” on page 9
Related Information
■
“Understanding InfiniBand Cabling” on page 9
■
“Understanding Switch Specifications” on page 1
Power Cord Requirements
The design of the switch is such that the power supplies are in a 2+2 redundancy.
Because there are four power supplies, this means that two power supplies must be
fully functional for the switch to be operational. Typically, line power is provided
from two sources, A and B. Configure the switch with A source feeding power
supplies 0 and 1, and B source feeding power supplies 2 and 3.
Your switch shipping kit should contain four power cords that are specific to your
country or application. The following table describes the power cords available.
Caution –
Only install and route power cabling in a matter that complies to federal,
state, and local electrical codes.
Related Information
■
“Electrical Specifications” on page 3
■
“Attach the Power Cords” on page 78
Cable Part Number
Description
180-2004-02
Blue 16A IEC 60309, IEC 60320 C19, 4.0M
180-2005-02
NEMA L6-20P, IEC 60320 C19, 4.0M
180-2060-02
Blue 20A Watertight IEC 60309, IEC 60320 C19, 4.0M
180-2061-02
Blue 16A Watertight IEC 60309, IEC 60320 C19, 4.0M
180-2381-01
IEC 60320 C20, IEC 60320 C19, 2.0M
180-2382-01
IEC 60320 C20, IEC 60320 C19, 1.0M