Identifying Ports
Pin
Signal Description
Pin
Signal Description
1
Request to Send
5
Ground
2
Data Terminal Ready
6
Receive Data
3
Transmit Data
7
Data Set Ready
4
Ground
8
Clear to Send
Related Information
■
■
“Front Panel Components” on page 14
■
“Rear Panel Components” on page 15
■
“Cabling Requirements” on page 51
■
“Connect the SER MGT Cable” on page 59
■
“Connect a Terminal or Emulator to the SER MGT Port” on page 67
NET MGT Port
The NET MGT RJ-45 port, located on the rear panel, provides an optional Ethernet connection
to the SP. The NET MGT port is an optional connection to the Oracle ILOM SP. The SP NET
MGT port uses an RJ-45 cable for a 10GBASE-T connection. If your network does not use a
DHCP server, this port will not be available until you configure network settings through the
“Rear Panel Components” on page 15
Connecting Cables
55
Summary of Contents for SPARC T8-4
Page 1: ...SPARC T8 4 Server Installation Guide Part No E80509 01 September 2017 ...
Page 2: ......
Page 8: ...8 SPARC T8 4 Server Installation Guide September 2017 ...
Page 10: ...10 SPARC T8 4 Server Installation Guide September 2017 ...
Page 22: ...22 SPARC T8 4 Server Installation Guide September 2017 ...
Page 28: ...28 SPARC T8 4 Server Installation Guide September 2017 ...
Page 64: ...64 SPARC T8 4 Server Installation Guide September 2017 ...
Page 82: ...82 SPARC T8 4 Server Installation Guide September 2017 ...
Page 88: ...88 SPARC T8 4 Server Installation Guide September 2017 ...