![Oracle SPARC T7-2 Installation Manual Download Page 21](http://html1.mh-extra.com/html/oracle/sparc-t7-2/sparc-t7-2_installation-manual_1646142021.webp)
Handling Precautions
Handling Precautions
Caution -
Deploy the anti-tilt bar on the equipment rack before beginning an installation.
Caution -
The server weighs approximately 80 lb (36.28 kg) with two processors or 76.6 lb
(32.88 kg) with one processor. Two people are required to lift and mount this 3U server into a
rack enclosure when using the procedures in this document.
Caution -
When completing a two-person procedure, always communicate your intentions
clearly before, during, and after each step to minimize confusion.
Related Information
■
“Physical Specifications” on page 15
■
“Installing the Server” on page 23
■
SPARC T7-2 Server Getting Started Guide
ESD Precautions
Electronic equipment is susceptible to damage by static electricity. Use a grounded antistatic
wrist strap, foot strap, or equivalent safety equipment to prevent electrostatic damage when you
install or service the servers.
Caution -
To protect electronic components from electrostatic damage, which can permanently
disable the system or require repair by service technicians, place components on an antistatic
surface, such as an antistatic discharge mat, an antistatic bag, or a disposable antistatic mat.
Wear an antistatic grounding strap connected to a metal surface on the chassis when you work
on system components.
Preparing for Installation
21
Summary of Contents for SPARC T7-2
Page 1: ...SPARC T7 2 Server Installation Guide Part No E54986 03 March 2016 ...
Page 2: ......
Page 8: ...8 SPARC T7 2 Server Installation Guide March 2016 ...
Page 14: ...14 SPARC T7 2 Server Installation Guide March 2016 ...
Page 40: ...40 SPARC T7 2 Server Installation Guide March 2016 ...
Page 74: ...74 SPARC T7 2 Server Installation Guide March 2016 ...