Server Overview
Steps Description
Links
8.
Attach data and management cables to the server.
“Connecting the Server Cables” on page 41
9.
Connect the power cords to the server, configure the Oracle
ILOM on the SP, power on the server for the first time, and set
up the operating system.
“Powering On the Server for the First Time” on page 53
Related Information
■
SPARC T7-2 Server Product Notes
■
SPARC T7-2 Server Safety and Compliance Guide
■
Servers Administration
■
Server Service
Server Overview
This topic provides a high-level introduction to the main components and capabilities of the
server.
Component
Description
Chassis
Rack-mountable server.
10
SPARC T7-2 Server Installation Guide • March 2016
Summary of Contents for SPARC T7-2
Page 1: ...SPARC T7 2 Server Installation Guide Part No E54986 03 March 2016 ...
Page 2: ......
Page 8: ...8 SPARC T7 2 Server Installation Guide March 2016 ...
Page 14: ...14 SPARC T7 2 Server Installation Guide March 2016 ...
Page 40: ...40 SPARC T7 2 Server Installation Guide March 2016 ...
Page 74: ...74 SPARC T7 2 Server Installation Guide March 2016 ...