130
SPARC M5-32 and SPARC M6-32 Servers Installation Guide • December 2014
10. Connect the power cord to the facility AC outlet.
Consult with your facilities manager or a qualified electrician for the specific
instructions on how to connect the power cords at your data center.
11. Label both ends of the power cords, the facility AC outlet, and the facility
circuit breakers with the AC input filter number or with a unique facility
number.
By labeling these components, you will be able to replace the power cords to the
appropriate outlets after servicing the server. When powering on the server for the
first time, you will switch on each circuit breaker in the order of the AC input
filters.
Summary of Contents for sparc M5-32
Page 1: ...SPARC M5 32 and SPARC M6 32 Servers Installation Guide Part No E41215 05 December 2014 ...
Page 8: ...viii SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 16: ...6 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Front Components ...
Page 18: ...8 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Rear Components ...
Page 21: ...Understanding the Server 11 FIGURE DCU Locations Rear of Server ...
Page 51: ...Preparing the Site 41 ...
Page 82: ...72 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 106: ...96 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 182: ...172 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...