Take Antistatic Measures
2.
Remove the cable management arm (CMA).
For instructions for removing the CMA, see the
“Remove the Cable Management Arm” in
Oracle Exadata Storage Server X5-2 High Capacity Installation Guide
.
3.
Extend the server to the maintenance position.
“Extend the Server to the Maintenance Position” on page 55
.
4.
From the front of the server, pull the green slide-rail release tabs toward the front
of the server, and pull the server out of the rack until is free of the rack rails [1
and 2].
A slide-rail release tab is located on each slide-rail.
5.
Set the server on a sturdy work surface.
Related Information
■
“Disconnect Cables From the Server” on page 54
■
“Extend the Server to the Maintenance Position” on page 55
■
“Reinstall the Server in the Rack” on page 164
Take Antistatic Measures
1.
Prepare an antistatic surface on which to set parts during removal and
installation.
Place electrostatic discharge (ESD-sensitive components on an antistatic mat. The following
items can be used as an antistatic mat:
Preparing for Service
57
Summary of Contents for EXADATA X5-2
Page 2: ......
Page 12: ...12 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...
Page 20: ...20 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...
Page 160: ...160 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...
Page 176: ...176 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...
Page 202: ...202 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...
Page 228: ...228 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...