
Power On the Server
■
Log in to the Oracle ILOM web interface, click Host Management → Power Control and
select Power On from the Select Action list.
■
Log in to the Oracle ILOM command-line interface (CLI), and type the following command
at the Oracle ILOM prompt:
->
start /System
When the server is powered on and the power-on self-test (POST) code checkpoint tests
have completed, the green Power/OK status indicator (LED) on the front panel of the server
lights and remains lit.
Related Information
■
“Powering Down the Server” on page 51
■
“Reconnect Power and Data Cables” on page 167
168
Oracle Exadata Storage Server X5-2 High Capacity Service Manual • January 2018
Summary of Contents for EXADATA X5-2
Page 2: ......
Page 12: ...12 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...
Page 20: ...20 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...
Page 160: ...160 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...
Page 176: ...176 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...
Page 202: ...202 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...
Page 228: ...228 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...