Required Tools
■
Motherboard (MB), designated as a backup quorum member.
■
Power supply (PS), designated as a backup quorum member.
When a server FRU that contains the KIP is removed and a replacement component is installed,
the KIP of the replacement component is programmed by Oracle ILOM to contain the same
KIP as the other two components.
Note -
Only one of the quorum members can be replaced at a time. Automated updates can only
be completed when two of the three quorum members contain matching key identity properties.
Related Information
■
“Servicing Power Supplies” on page 71
■
“Servicing the Storage Drive Backplanes” on page 112
■
“Servicing the Motherboard Assembly” on page 145
Required Tools
The server can be serviced with the following tools:
■
Antistatic wrist strap
■
Antistatic mat
■
No. 2 Phillips screwdriver
Related Information
■
“Preparing for Service” on page 47
■
“Servicing Components That Do Not Require Server Power-Off” on page 61
■
“Servicing Components That Require Server Power-Off” on page 77
Preparing the Server for Component Replacement
Note -
When you are replacing the storage drives or power supplies, not all of these procedures
are necessary. See the replacement procedures for those components for more information.
50
Oracle Exadata Storage Server X5-2 High Capacity Service Manual • January 2018
Summary of Contents for EXADATA X5-2
Page 2: ......
Page 12: ...12 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...
Page 20: ...20 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...
Page 160: ...160 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...
Page 176: ...176 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...
Page 202: ...202 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...
Page 228: ...228 Oracle Exadata Storage Server X5 2 High Capacity Service Manual January 2018 ...