To Apply Power
To Apply Power
Note -
Before you apply power to the system, read
Chapter 3, “Operating Protocol Mode
, which describes how to change the operating protocol mode of the
universal HBA. It is important to perform the steps in
Chapter 3, “Operating Protocol Mode
prior to applying power to the system to prevent potential configuration errors.
If the system was powered down prior to installing the universal HBA, power it on as follows:
1.
Verify that the universal HBA is securely installed in the system.
2.
Verify that the correct data cable is attached.
3.
Refer to your system installation or service manual to determine how to power
on the system.
4.
Observe the light-emitting diode (LED) status as shown in
Host Bus Adapter LED Status Indicators for CNA Mode,” on page 36
FCoE) or
Table 8, “Universal Host Bus Adapter LED Status Indicators for Fibre
Channel Only Mode ,” on page 37
(for 16 Gb, 8 Gb, or 4 Gb FC) to verify that
the universal HBA is operating.
34
Sun Storage 16 Gb Fibre Channel PCIe Universal Host Bus Adapter, QLogic Installation Guide For HBA Model
7101674 • August 2018