Section 5 Probe Installation Preparation
This section shows the procedures necessary for installation of tank-probes that will be connected to your
Nano console.
Topics in this section include:
"Probe Placement" on the next page
"Product Offset Calculation" on page 35
"Riser, Manhole and Junction Box Installation" on page 36
"Conduit Seal Fittings for Cables" on page 39
"Probe Installation in Underground Storage Tanks" on page 42
Doc. No.: M2010-EU Rev.: 13
Page 33 of 149
Summary of Contents for M2010-EU
Page 6: ...Warranty 147 Doc No M2010 EU Rev 13 Page 6 of 149...
Page 20: ...Main Board Connections Jumpers and LEDs Doc No M2010 EU Rev 13 Page 20 of 149...
Page 21: ...Conduit Installation Doc No M2010 EU Rev 13 Page 21 of 149...
Page 22: ...Field Wiring Diagram Doc No M2010 EU Rev 13 Page 22 of 149...
Page 32: ...Doc No M2010 EU Rev 13 Page 32 of 149...
Page 38: ...924B Probe Installation DMP Probe Installation Doc No M2010 EU Rev 13 Page 38 of 149...
Page 41: ...Doc No M2010 EU Rev 13 Page 41 of 149...
Page 86: ...Typical Installation Drawings 30 0230 S Doc No M2010 EU Rev 13 Page 86 of 149...
Page 110: ...Appendix C Declaration of Conformity Doc No M2010 EU Rev 13 Page 110 of 149...
Page 111: ...Doc No M2010 EU Rev 13 Page 111 of 149...
Page 112: ...Doc No M2010 EU Rev 13 Page 112 of 149...
Page 113: ...Doc No M2010 EU Rev 13 Page 113 of 149...
Page 142: ...Doc No M2010 EU Rev 13 Page 142 of 149...
Page 146: ...Doc No M2010 EU Rev 13 Page 146 of 149...
Page 149: ......