Version 1.0.4 - 2020-10-13
26
Translation of original instruction
SD500AV
EN
SD500A
V_G
B
_3.
fm
Lateral pilot bearings of the saw band
Check if the saw band is positioned
between the lateral pilot bearings.
Fig.3-10:
Saw band guidance on the right
Saw band tension
Check the tension of the saw band.
Adjusting the Saw band tension on page 45
3.3
First commissioning
WARNING!
First commissioning may only take place after proper installation.
When first commissioning the metal band saw by inexperienced staff you endanger
people and the machine. We do not accept any liability for damages caused by
incorrectly performed commissioning.
3.3.1
Running-in process
INFORMATION
During initial commissioning, the frequency inverter may first detect an overload due to
the novelty of the components and thus switch off the drive. Therefore, let the metal
band saw run in without load first. If necessary, reduce the saw band tension beforehand
and increase the saw band tension gradually during the running-in process.
Pay attention to running noises or scratching noises that may be caused by the saw
band, if the saw band not run exactly on the saw band rollers.
Please also pay attention to the ambient temperature of the commissioning location and
the temperature of the metal band saw if it was delivered directly in a cold season.
3.4
Electrical connection
WARNING!
The three-phase electrical connection may only be performed by an electrician or under
the guidance and supervision of an electrician.
CAUTION!
Position the power lead for the machine in such a manner that people cannot trip over it.
Check the fusing (fuse) of your electrical supply according to the technical instructions
regarding the total connected power of the machine.
Firmly connect the machine.
Please check that the type of current, voltage and protection fuse correspond to the values spe-
cified. A protective earth ground wire connection must be available.
Mains fuse 16A.
Guide bearing
right
Saw blade brush
Summary of Contents for Optimum 3292385
Page 1: ...GB Operating Instructions Version 1 0 4 Metal band saw Part no 3292385...
Page 55: ...Version 1 0 4 2020 10 13 55 Originalbetriebsanleitung SD500AV DE EN SD500AV_parts fm Fig 6 2...
Page 65: ...Version 1 0 4 2020 10 13 65 Originalbetriebsanleitung SD500AV DE EN SD500AV_wiring diagram fm...
Page 80: ...Version 1 0 4 2020 10 13 80 Translation of original instruction SD500AV EN SD500AV_GBSIX fm...