OPTIMUM
M A S C H I N E N - G E R M A N Y
Safety
Version 2.2.2 dated 2014-03-07
Page 11
Original operating instructions
B24H | B24HV | B28H | B28HV
GB
The electrical specialist is specially trained for the working environment in which he is working
and knows the relevant standards and regulations.
Specialist staff
Due to his professional training, knowledge and experience as well as his knowledge of rele-
vant regulations the specialist staff is able to perform the assigned tasks and to recognise and
avoid any possible dangers himself.
Instructed persons
Instructed persons were instructed by the operating company about the assigned tasks and any
possible risks in case of improper behaviour.
1.5.2 Authorized persons
WARNING!
Inappropriate operation and maintenance of the drilling machine constitutes a danger for
the staff, objects and the environment.
Only authorized staff may operate the drilling machine !
Persons authorized to operate and maintain should be trained technical staff and instructed by
the ones who are working for the operating company and for the manufacturer.
The operating company must
Obligations of
the operating
company
train the staff,
instruct the staff in regular intervals (at least once a year) on
- all safety standards that apply to the machine,
- the operation,
- accredited technical guidelines,
check staff‘s state of knowledge,
document the trainings/instructions,
require staff to confirm participation in training/instructions by means of a signature,
check whether the staff is working safety- and risk-conscious and observe the operating
instructions.
The operator must
Obligations of
the operator
have obtained a training regarding the handling of the drilling machine,
know the function and mode of action,
before taking the machine in operation
- have read and understood the operating manual,
- be familiar with all safety devices and instructions.
Additional
requirements
regarding the
qualification
For work on the following parts there are additional requirements:
Electrical parts or operating agents: shall only be performed by an electrician or under the
guidance and supervision of an electrician.
Before starting work on electrical parts or operating agents, following measures are to be
performed in the following order.
- Disconnect all poles.
- Secure against switching on.
- Check if the machine is zero potential.