Solar Hybrid Inverter
SP6000 Handy Ultra 120V SP8000 Handy Ultra 230V
Version: 1.1
User Manual
Page 1: ...Solar Hybrid Inverter SP6000 Handy Ultra 120V SP8000 Handy Ultra 230V Version 1 1 User Manual...
Page 2: ...BMS Communication 13 OPERATION 14 Power ON OFF 14 Inverter Turn on 14 Operation and Display Panel 14 LCD Display Icons 15 LCD Setting 17 LCD Display 31 Operating Mode Description 36 Faults Reference C...
Page 3: ...t to correctly operate this inverter 8 Be very cautious when working with metal tools on or around batteries A potential risk exists to drop a tool to spark or short circuit batteries or other electri...
Page 4: ...via LCD control panel Configurable AC PV output usage timer and prioritization Configurable AC Solar charger priority via LCD control panel Configurable battery charging current based on applications...
Page 5: ...s USB communication port and USB function port 5 Function buttons 16 BMS communication port CAN RS 485 or RS 232 6 Power on off switch 17 Output source indicators refer to OPERATION Operation 7 AC inp...
Page 6: ...n removing the bottom cover be carefully to remove three cables as shown below Mounting the Unit Consider the following points before selecting where to install Do not mount the inverter on flammable...
Page 7: ...onnection To reduce risk of injury please use the proper recommended cable and terminal size as below Recommended battery cable and terminal size Model Typical Amperage Battery capacity Wire Size Cabl...
Page 8: ...rminal blocks with IN and OUT markings Please do NOT mis connect input and output connectors WARNING All wiring must be performed by a qualified personnel WARNING It s very important for system safety...
Page 9: ...to implement PV module connection CAUTION Appliances such as air conditioner requires at least 2 3 minutes to restart because it s required to have enough time to balance refrigerant gas inside of ci...
Page 10: ...pressure dome tightly to female connector and male connector as shown below Step 4 Check correct polarity of connection cable from PV modules and PV input connectors Then connect positive pole of conn...
Page 11: ...ower 8000W 8000W Max PV Array Open Circuit Voltage 250Vdc 500Vdc PV Array MPPT Voltage Range 90Vdc 230Vdc 90Vdc 450Vdc Start up Voltage Voc 80Vdc 80Vdc Recommended solar panel configuration for SP6000...
Page 12: ...2pcs 3000W 6pcs in series 6pcs in series 12pcs 3000W 6pcs in series 2 strings x 12pcs 3000W x 6pcs in series 2 strings 12pcs 3000W 8pcs in series 2 strings x 16pcs 4000W x 8pcs in series 2 strings 16p...
Page 13: ...LCD module can be removable and installed in a remote location with an optional communication cable Please take the follow steps to implement this remote panel installation Step 1 Remove the screw on...
Page 14: ...mounted to your desired location Note Wall installation should be implemented with the proper screws to the right Step 3 After LCD module is installed connect LCD module to the inverter with an option...
Page 15: ...eck Appendix III Dry Contact Signal There is one dry contact 3A 250VAC available on the rear panel It could be used to deliver signal to external device when battery voltage reaches warning level Unit...
Page 16: ...brightness speed and so on can be configured through the LCD panel Please refer to LCD settings for the details Operation and Display Panel The operation and the LCD module shown in the chart below in...
Page 17: ...nfirm enter the selection in setting mode LCD Display Icons Icon Function description Input Source Information Indicates the AC input Indicates the PV input Indicate input voltage input frequency PV v...
Page 18: ...pacity Load Percentage Battery Voltage LCD Display Load 50 1 85V cell 1 85V cell 1 933V cell 1 933V cell 2 017V cell 2 017V cell Load 50 1 892V cell 1 892V cell 1 975V cell 1 975V cell 2 058V cell 2 0...
Page 19: ...rovides power to the loads as first priority If solar energy is not sufficient to power all connected loads Utility energy will supply power to the loads at the same time SBU priority Solar energy pro...
Page 20: ...ected battery charge voltage and low DC cut off voltage can be set up in program 26 27 and 29 Pylontech battery If selected programs of 02 26 27 and 29 will be automatically set up No need for further...
Page 21: ...6 27 and 29 will be automatically set up No need for further setting Please contact the battery supplier for installation procedure 06 Auto restart when overload occurs Restart disable default Restart...
Page 22: ...harging current from program 02 for utility charger 30A default Setting range is 2A then from 10A to 120A for SP6000 Handy Ultra SP8000 Handy Ultra model Increment of each click is 10A 12 Setting volt...
Page 23: ...source priority If this inverter is working in Line Standby or Fault mode charger source can be programmed as below Solar first Solar energy will charge battery as first priority Utility will charge b...
Page 24: ...ssed for 1 minute Stay at latest screen If selected the display screen will stay at latest screen user finally switches 20 Backlight control Backlight on default Backlight off 22 Beeps while primary s...
Page 25: ...be set up Setting range is from 48 0V to 62 0V for SP6000 Handy Ultra SP8000 Handy Ultra models Increment of each click is 0 1V 28 AC output mode only for SP6000 Handy Ultra SP8000 Handy Ultra model T...
Page 26: ...this program can be set up Setting range is from 42 0V to 48 0V for SP6000 Handy Ultra SP8000 Handy Ultra Increment of each click is 0 1V Low DC cut off voltage will be fixed to setting value no matte...
Page 27: ...le is selected it will cancel equalization function until next activated equalization time arrives based on program 35 setting At this time will not be shown in LCD main page 37 Reset all stored data...
Page 28: ...l for RGB LED It s necessary to enable this setting to activate RGB LED lighting function Enabled default Disable 52 Brightness of RGB LED Low Normal default High 53 Lighting speed of RGB LED Low Norm...
Page 29: ...t White Sky blue Pink Honey C02 White Yellow Green Royal blue Lime yellow 93 Erase all data log Not reset Default Reset 94 Data log recorded interval The maximum data log number is 1440 If it s over 1...
Page 30: ...ting Insert an OTG USB disk into the USB port Press and hold button for 3 seconds to enter USB Setup Mode These functions including inverter firmware upgrade data log export and internal parameters re...
Page 31: ...essage for USB On the Go functions Error Code Messages No USB disk is detected USB disk is protected from copy Document inside the USB disk with wrong format If any error occurs error code will only s...
Page 32: ...button to enter the selectable programs detail descriptions in Step 3 Step 3 Please select setting program by following each procedure Program Operation Procedure LCD Screen Press button to set up So...
Page 33: ...is switched as the following table in order Selectable information LCD display Input voltage Output voltage Default Display Screen Input Voltage 230V output voltage 230V Input frequency Input frequenc...
Page 34: ...32 PV1 current 2 5A dual input model PV2 current 2 5A dual input model PV power PV power 500W PV1 power 500W dual input model PV2 power 500W dual input model...
Page 35: ...arging current 50A PV charging current 50A AC charging current 50A Charging power AC and PV charging power 500W PV charging power 500W AC charging power 500W Battery voltage and output voltage Battery...
Page 36: ...xVA like below chart When load is larger than 1kVA 1KVA load in VA will present x xkVA like below chart Load in Watt When load is lower than 1kW load in W will present xxxW like below chart When load...
Page 37: ...energy this month This PV month energy 388kWh Load month energy 988kWh PV energy generated this year and Load output energy this year This PV year energy 3 88MWh Load year energy 9 88MWh PV energy ge...
Page 38: ...rsion 00000 24 Operating Mode Description Operation mode Description LCD display Standby mode Note Standby mode The inverter is not turned on yet but at this time the inverter can charge battery witho...
Page 39: ...by utility and PV energy Charging by utility Charging by PV energy No charging Line Mode The unit will provide output power from the mains It will also charge the battery at line mode Charging by util...
Page 40: ...ed as output source priority and battery is not connected solar energy and the utility will provide the loads Power from utility Battery Mode The unit will provide output power from battery and or PV...
Page 41: ...Output short circuited 06 Output voltage is too high 07 Overload time out 08 Bus voltage is too high 09 Bus soft start failed 10 PV over current 11 PV over voltage 12 DCDC over current 13 Battery dis...
Page 42: ...charged Beep once every second 04 Low battery Beep once every second 07 Overload Beep once every 0 5 second 10 Output power derating Beep twice every 3 seconds 15 PV energy is low Beep twice every 3...
Page 43: ...float stage when the setting equalization interval battery equalization cycle is arrived or equalization is active immediately the controller will start to enter Equalize stage Equalize charging time...
Page 44: ...urrent 60A 60A Nominal Input Frequency 50Hz 60Hz Auto detection Low Loss Frequency 40 1Hz Low Loss Return Frequency 42 1Hz High Loss Frequency 65 1Hz High Loss Return Frequency 63 1Hz Output Short Cir...
Page 45: ...load Surge Capacity 2 rated power for 5 seconds Nominal DC Input Voltage 48Vdc Cold Start Voltage 46 0Vdc Low DC Warning Voltage load 20 46 0Vdc 20 load 50 42 8Vdc load 50 40 4Vdc Low DC Warning Retu...
Page 46: ...tep Charging Curve Time Battery Voltage per cell Charging Current 100 50 Bulk Constant Current Absorption Constant Voltage Maintenance Floating Current Voltage T1 minimum 10mins maximum 8hrs 2 43Vdc 2...
Page 47: ...Relative Humidity Non condensing Dimension D W H mm 147 4x 432 5 x 553 6 Net Weight kg 18 4 Table 5 Parallel Specifications Parallel model only Max parallel numbers 6 Circulation Current under No Load...
Page 48: ...dly LCD display and LEDs are flashing Battery is disconnected Check if battery wires are connected well Buzzer beeps continuously and red LED is on Fault code 07 Overload error The inverter is overloa...
Page 49: ...approx 20 cm to the side and approx 50 cm above and below the unit Be sure to install each unit in the same level 3 Wiring Connection WARNING It s REQUIRED to connect battery for parallel operation Th...
Page 50: ...l Recommended breaker specification of AC input with single phase Model 2 units 3 units 4 units 5 units 6 units SP6000 Handy Ultra 120A 230VAC 180A 230VAC 240A 230VAC 300A 230VAC 360A 230VAC SP8000 Ha...
Page 51: ...49...
Page 52: ...50 Three inverters in parallel Power Connection Communication Connection 2 1 3 Four inverters in parallel Power Connection Communication Connection 2 1 3 4...
Page 53: ...51 Five inverters in parallel Power Connection Communication Connection 2 1 3 4 5 Six inverters in parallel Power Connection Communication Connection 2 1 3 4 5 6...
Page 54: ...e Power Connection P1 N L1 L2 L3 N L1 L2 L3 P2 P3 Communication Connection 2 1 3 4 5 6 P1 P2 P3 Four inverters in one phase and one inverter for the other two phases Power Connection P1 P3 N L1 L2 L3...
Page 55: ...the third phase Power Connection P1 P3 N L1 L2 L3 N L1 L2 L3 P2 Communication Connection 2 1 3 4 5 6 P1 P3 P2 Three inverters in one phase and only one inverter for the remaining two phases Power Con...
Page 56: ...ning phase Power Connection P1 P3 N L1 L2 L3 N L1 L2 L3 P2 Communication Connection 2 1 3 4 5 P1 P3 P2 Two inverters in one phase and only one inverter for the remaining phases Power Connection P1 P3...
Page 57: ...3 P2 P1 WARNING Do not connect the current sharing cable between the inverters which are in different phases Otherwise it may damage the inverters 4 3 Support split phase equipment only for SP6000 Han...
Page 58: ...unication Connection 2 1 3 4 P1 P2 One inverter in each phase Power Connection P1 N L1 L2 N L1 L2 P2 Communication Connection 2 1 P1 P2 5 PV Connection Please refer to user manual of single unit for P...
Page 59: ...se 3P2 in program 28 for the inverters connected to L2 phase and 3P3 in program 28 for the inverters connected to L3 phase Be sure to connect share current cable to units which are on the same phase D...
Page 60: ...uirements before commissioning Correct wire connection Ensure all breakers in Line wires of load side are open and each Neutral wires of each unit are connected together Step 2 Turn on each unit and s...
Page 61: ...e setting cannot be programmed Step 3 Turn on all units sequentially LCD display in L1 phase unit LCD display in L2 phase unit LCD display in L3 phase unit Step 4 Switch on all AC breakers of Line wir...
Page 62: ...4 Switch on all AC breakers of Line wires in AC input If AC connection is detected and split phases are matched with unit setting they will work normally Otherwise the AC icon will flash and they will...
Page 63: ...oss 83 The battery voltage of each inverter is not the same 1 Make sure all inverters share same groups of batteries together 2 Remove all loads and disconnect AC input and PV input Then check battery...
Page 64: ...master battery first battery are to set up or change the group address NOTE 1 is upper position and 0 is bottom position Dip 1 Dip 2 Dip 3 Dip 4 Group address 1 RS485 baud rate 9600 Restart to take ef...
Page 65: ...Note for parallel system 1 Only support common battery installation 2 Use custom made RJ45 cable to connect any inverter no need to connect to a specific inverter and Lithium battery Simply set this...
Page 66: ...ring and commissioning is successfully if battery is not detected the inverter will automatically activate battery if the inverter is powered on WECO Step 1 Use a custom made RJ45 cable to connect inv...
Page 67: ...lish communication SOLTARO Step 1 Use a custom made RJ45 cable to connect inverter and Lithium battery Please take notice for parallel system 1 Only support common battery installation 2 Use one custo...
Page 68: ...ill flash Generally speaking it will take longer than 1 minute to establish communication 4 LCD Display Information Press or button to switch LCD display information It will show battery pack and batt...
Page 69: ...um battery Communication lost occurs after the inverter and battery is connected successfully buzzer beeps immediately Battery number is changed It probably is because of communication lost between ba...
Page 70: ...ccurs Allows users to query inverter history data 2 WatchPower App 2 1 Download and install APP Please scan the following QR code with your smart phone and download WatchPower App Android system iOS s...
Page 71: ...Wi Fi Config page There are detailed setup procedure listed in How to connect section and you may follow it to connect Wi Fi Enter the Settings Wi Fi and select connected Wi Fi name The connected Wi F...
Page 72: ...Fi module and the Internet If the connection fails please repeat Step 2 and 3 Diagnose Function If the module is not monitoring properly please tap on the top right corner of the screen for further de...
Page 73: ...ed name and password to login Note Tick Remember Me for your login convenience afterwards Overview After login is successfully you can access Overview page to have overview of your monitoring devices...
Page 74: ...to add device This part number label is pasted on the bottom of remote LCD panel After entering part number tap Confirm to add this device in the Device list For more information about Device List ple...
Page 75: ...en there is a dynamic power flow chart to show live operation It contains five icons to present PV power inverter load utility and battery Based on your inverter model status there will be Standby Mod...
Page 76: ...nfirm to complete name modification Device Information Data Users can check up Basic Information Product Information Rated information History and Wi Fi Module Information by swiping left Basic Inform...
Page 77: ...in the column Each function setting is saved by clicking Set button Please refer to below parameter setting list for an overall description and be noted that the available parameters may vary dependi...
Page 78: ...sable Functions LCD Auto return to Main screen If enable LCD screen will return to its main screen after one minute automatically Fault Code Record If enabled fault code will be recorded in the invert...