C200
H
ARDWARE
Instruction Manual C200 Part1 A1.doc
optek Danulat GmbH
•
D-45356 Essen
•
Germany
page 19
*
5
Start-up / Maintenance
5.1 Start-up
basic
rules:
1.
Read the instructions manual first – install later !!!
2.
Installation should be done by skilled personnel only !!!
3.
If something is not clear – check first – install later !!!
procedure
(referring to sections in
this instructions manual)
initial
start-up
start-up
after stop
read all of the instructions manual !!!
XXX
XXX
check equipment to be complete as ordered
XXX
inspect parts for damage
XXX
install measuring cell and sensors
XXX
check line for leakage
XXX
install probe cables
XXX
connect cables
XXX
connect power
XXX
power up converter
XXX XXX
allow 20 min. to warm-up
XXX XXX
adjust converter (separate document)
XXX
document installation
XXX
(XXX)
check readings for correctness
XXX XXX
release measurement for control purpose
XXX XXX
Check separate instructions manual for sensors !