OPT MACHINE VISION TECH.CO. LTD
ADD:8 JingSheng Road, JingXia ChangAn DongGuan China 523853
TEL: 0769-82716188 FAX: 0769-81606698
E-mail:
Website:Http://www.optmv.net
11
2.1 DIN guide rail installation
1
、
Installation (Fig.2.1): (1) Lock the controller back panel DIN rail track to position 1 rail.
(2) Push down controller toward position 2.
2
、
Uninstallation (Fig.2.2): (1) Pull down the controller.
(2) Push up toward position1.
2.2 Screw installation
Installation (Fig.2.3):
1
、
Secure back-plate against controller.
2
、
Tighten the screws.
3
、
Tighten the back-plate to fixtures or stations.
2.3 Installation size
Fig.2.2: Guide rail Uninstallation
Fig.2.4: DIN guide rail size
Fig.2.3: Screws installation
Fig.2.5: Screw size
position 1
position 2
Fig. 2.1: Guide rail installation