9-40
INTEGRA Operations Revision A
7/26/00
20-0200-231 (CR), 20-0200-232 (Std), 20-0200-251 (CD)
Change EDGE CLEAN OFF TIME
29 Touch EDGE CLN OFF TIME for
Brush Station #1 Cleaning
to
display the
NUMBER PAD
and set the length (duration) of the time
delay between edge cleaning cycles.
30 Enter the desired time in
10
th
of seconds
on the
NUMBER PAD
(not
shown), and touch ENTER.
Use the EDGE CLN OFF TIME button to set the length of the time
delay between edge cleaning cycles.
31 Touch EDGE CLN OFF TIME for
Brush Station #2 Cleaning
to
display the
NUMBER PAD
and set the length (duration) of the time
delay between edge cleaning cycles.
32 Enter the desired time in
10
th
of seconds
on the
NUMBER PAD
(not
shown), and touch ENTER.
The
EDGE CLN OFF TIME
value
displays on the screen in
seconds
.
STANDARD
Summary of Contents for Synergy Integra
Page 8: ......
Page 24: ...1 4 INTEGRA Operations Revision A 7 26 00 20 0200 231 CR 20 0200 232 Std 20 0200 251 CD...
Page 38: ...2 14 INTEGRA Operations Revision A 7 26 00 20 0200 231 CR 20 0200 232 Std 20 0200 251 CD...
Page 222: ...9 62 INTEGRA Operations Revision A 7 26 00 20 0200 231 CR 20 0200 232 Std 20 0200 251 CD...
Page 314: ...10 76 INTEGRA Operations Revision A 7 26 00 20 0200 231 CR 20 0200 232 Std 20 0200 251 CD...