3.6 Getting started
PLEASE NOTE
Make sure that the overall rated performance of the load con-
nected does not exceed the capacity of the UPS system. The
power consumption of inductive loads or laser printers can be
very high, please take this into consideration when specifying
your UPS system.
1. Connect the load with the UPS system without switching them
on. Make sure that the UPS system has two groups of output
sockets. The programmable output sockets can be switched in-
dependently of the remaining sockets. The programmable out-
put sockets are primarily designed for less critical load which
cannot be brought down using software. Critical load should not
be connected to the programmable output sockets.
2. Connect the power supply cable (supplied with the ZINTO 2000
and 3000) for the UPS system into a socket. The display on the
UPS system shows “Sb”.
3.
Hold the “ON / MUTE” button on the UPS system down until you
hear a short beep.
4. The UPS system carries out a self-
test, after which “OK” ap-
pears on the display. The UPS system is now operating in nor-
mal mode and supplying the load with reliable power.
5. If an additional emergency power off switch has been installed,
the emergency stop function needs to be tested.
6. Switch the load on one by one.
PLEASE NOTE
The internal batteries charge up to 90% of their full capacity in
less than six hours. ONLINE recommends charging the bat-
teries for 48 hours after installation or extended periods of
non-use.
The batteries start to charge as soon as the UPS system is
connected to the supply network and supplied with power, ir-
respective of the operating mode.