background image

Automatic Tyre Kille

2Z-ATK-6M

r Manual

Summary of Contents for 2Z-ATK-6M

Page 1: ...Automatic Tyre Kille 2Z ATK 6M r Manual ...

Page 2: ...amage forbid disassemble equipment This product used with hazardous voltage whole system need periodically inspect prevent personal injury Correct wiring connection according to directions to prevent equipment damage Please turn off power immediately when encounter any abnormalities in commissioning ...

Page 3: ... belt and steel plate blade adopts electronic mechanical integrated control device It is an advanced device that intercepts unauthorized vehicles and terrorists has easy to operate reliable and safe advantages Features 1 The structure has sturdy and durable stable speed low noise advantages can adapt to a variety of working environment 2 Mechanical hydraulic drive simple installation easy maintena...

Page 4: ... upon are RVV line 10 Wire stripper 11 Screwdriver and wrench 12 Set of hex wrenches Installation Steps 1 Well prepared clear the order and location of the various parts of the installation excavate foundation Note Depth of foundation Tyre killer height H Concrete thickness 300mm Length Tyre killer length L1 Watering concrete 400mm Width Tyre killer width W1 Watering concrete 400mm And one spare p...

Page 5: ...ctronic control system in the control room 4 Pour 300mm depth C30 concrete over drainpipe at least have 3 T pipe orifices of the drainpipe averagely be set upon concrete level after concrete pouring stir it with electric concrete vibrator Have to choose C30 Or higher mark concrete to guarantee the foundation strength if customer request could reinforce steel bar inside foundation concrete Concrete...

Page 6: ...o electronic control system 7 Secondary evenly pouring concrete around the equipment prevent concrete entering the equipment Shake concrete with electric concrete vibrator to reduce the gap If the equipment changes position when pouring have to promptly adjusted After the adjustment continue to construction and finish the second pouring work 8 Connect button panel 9 According to the scene to resto...

Page 7: ...ut 5 Non professionals are not free to disassemble the various components of equipment to change the working environment of the device or working voltage 6 If the system fails notify company forbidden to handle the situation by clients without technique support so as to avoid unnecessary losses 7 Forbidden to move the dedicated button box at will to prevent loosening of internal wiring 8 When not ...

Page 8: ... on each terminal and each electrical component loosely every month 4 Regularly perform dust removal and maintenance on the surface of the equipment and the electrical control system 5 Screw the gear mechanism and mechanical fixing mechanism of the equipment regularly 6 Regularly clean up the internal debris of the equipment Once per month 7 Clean the environment around the equipment every day and...

Reviews: