Editing the SFC Chart
Section 3-2
79
A convergence and a subsequent step will be added.
2 Right-click the created convergence, and select
Connections
-
Add Connection
from the pop-up menu.
The Add Connection dialog will be displayed.
3 Confirm that the transitions to be joined are selected in the Add Connection dialog,
and click
OK
.
The selected transitions will be joined to the convergence.
Note 1:
You can also right-click the convergence, select
Connections
-
Add Connection to
Convergence
from the pop-up menu, and drag the lead line to the target transition to
connect transitions to a convergence.
2:
Right-click the line next to a conditional branch and select
Use Default Transition
Precedence
to numerically display the execution order starting from 1. Then
double-click the numbers to change the execution order as desired.
3-2-8
Creating a Simultaneous Sequence Divergence/Convergence
Creating a Simultaneous Sequence Divergence
Adding 2 Steps
A simultaneous sequence divergence can be added after a transition.
1 Right-click a transition, and select
Add Simultaneous Sequence Divergence
from the pop-up menu.
Summary of Contents for SYSMAC CX-Programmer 8.1
Page 1: ...Operation Manual SFC Programming SYSMAC WS02 CXPC1 V8 CX Programmer Ver 8 1 Cat No W469 E1 04...
Page 2: ...ii CX Programmer Ver 8 1 WS02 CXPC1 V8 Operation Manual SFC Programming Revised February 2009...
Page 16: ......
Page 56: ...Precautions When Creating SFC Programs Section 1 5 40...
Page 118: ...Monitoring Section 4 5 102...
Page 150: ...Index 134...
Page 152: ...Revision History 136...
Page 153: ......
Page 154: ......