![Omron RL4 Series Startup Manual Download Page 68](http://html.mh-extra.com/html/omron/rl4-series/rl4-series_startup-manual_1633412068.webp)
3-3
Programming and Simulation Proce-
dures
This section describes the procedure for creating project files, programing, and setting and checking
operation in simulation.
The simulation function allows you to check the equipment operation in advance without purchasing
actual equipment.
3-3-1
Creating a Project File
Create a project in the Sysmac Studio.
1
Start the Sysmac Studio and click
New Project
in the Start page.
The
Project Properties
dialog box is displayed.
2
In the
Project Properties
dialog box, enter the
Project name
,
Author
, and
Comment
, and
select the
Category
,
Device
, and
Version
as shown in the figure below.
3
Select the
Open in Emulation Mode
check box, and click the
Create
button.
3 Implementation Example of Static Pick-and-place Equipment
3-18
NJ-series Robot Integrated System Startup Guide (O049)
Summary of Contents for RL4 Series
Page 4: ...AC1 152000 Introduction 2 NJ series Robot Integrated System Startup Guide O049 ...
Page 23: ...Outline View Detailed View Versions 21 NJ series Robot Integrated System Startup Guide O049 ...
Page 30: ...Revision History 28 NJ series Robot Integrated System Startup Guide O049 ...
Page 42: ...1 Overview 1 12 NJ series Robot Integrated System Startup Guide O049 ...
Page 50: ...2 Before You Begin 2 8 NJ series Robot Integrated System Startup Guide O049 ...
Page 162: ...Appendices A 18 NJ series Robot Integrated System Startup Guide O049 ...
Page 164: ...Appendices A 20 NJ series Robot Integrated System Startup Guide O049 ...
Page 167: ......