![Omron R6YXG500 Installation Manual Download Page 76](http://html1.mh-extra.com/html/omron/r6yxg500/r6yxg500_installation-manual_742792076.webp)
2
Installa
tion
2-18
2.3.3 Moving the R6YXGS300 and R6YXGS400
1
Fold the arms.
Take out the robot from the case or remove it from the pallet. Fold the arms while referring to the Fig. below.
Moving the robot
Robot cable
Robot main
body
Support
Support
2
Place the robot on the base.
One work person holds the support of the robot main body with both hands and other work person holds the robot cable to
place the robot on the base.
3
Temporarily secure the robot by tightening the bolts.
NOTE
For details about tightening torque to secure the robot firmly, see "2.4 Installing the robot".
Summary of Contents for R6YXG500
Page 1: ...ZX T Series Cat No I155E EN 03A R6Y XG series INSTALLATION MANUAL SCARA Robots XG Series...
Page 2: ......
Page 10: ......
Page 36: ......
Page 38: ......
Page 40: ......
Page 46: ......
Page 48: ......
Page 56: ......
Page 174: ......
Page 176: ......
Page 220: ......
Page 221: ...Chapter 4 Periodic inspection Contents 1 Overview 4 1 2 List of inspection items 4 2...
Page 222: ......
Page 226: ......
Page 227: ...Chapter 5 Harmonic drive replacement period Contents 1 Overview 5 1 2 Replacement period 5 2...
Page 228: ......
Page 232: ......
Page 238: ......
Page 240: ......
Page 244: ......
Page 246: ......
Page 323: ...8 Specifications 8 77 1 3 Robot inner wiring diagram Robot inner wiring diagram R6YXG500...