8. Communication Test and Collecting Start
8-1
Communication Test and Collecting Start
8.
After configuring EQ100 settings and before starting data collecting, perform the
communication test with measurement devices. This communication test does not log
measured data to the EQ100 internal memory.
When no problem is found in the communication test, transition the status of EQ100 from setup
to collecting and start the measured data collecting and logging to internal memory.
The communication
test can be performed by EQ-Manager or Web UI screen. On EQ-Manager,
you can check the communication status between EQ100 and measurement devices. On the
Web UI screen, you can check the detailed information including communication success rate
and communication speed between EQ100 and measurement devices.
Precautions
- The communication test checks stable data collecting by EQ100 from measurement devices.
Before starting the collecting, always perform the communication test.
8.1. Preparation for Communication Test
Before starting the communication test, check the following items.
1) The setup DIP switches SW7, SW8, and SW10 must be all OFF.
2) The power of EQ100 as well as all of the connection devices and measurement devices must
be on.
SW7, SW8, SW10
→
OFF
Measurement Devices
Measurement Devices
Collecting
Collecting
Collected Data
Collected Data
Internal Memory
Not logged
Logged
Communication Test
Collecting Started
Internal Memory