
58
Installing the CPM2C-S
Section 3-3
2.
Align the Unit and CPU Unit (or previous Expansion I/O Unit or Expansion
Unit) so that the catches (top and bottom) on the connectors fit together.
Press the Units together to connect them.
3.
Lock the Units together by closing the locks (top and bottom) on the CPU
Unit (or previous Expansion I/O Unit or Expansion Unit). Place the cover
(included with the CPU Unit) on the last Unit’s expansion I/O connector.
3-3-2
CPM2C-S Installation
The CPM2C-S can be installed on a 35-mm DIN track.
Expansion I/O
connector cover
Slide to lock
Units together.
End Plates
(PFP-M)
DIN Track
PFP-100N (1 m)
PFP-50N (50 cm)
PFP-100N2 (1 m)
Summary of Contents for CPM2C-S100C
Page 2: ......
Page 3: ...CPM2C S Programmable Controller Operation Manual Revised September 2009 ...
Page 4: ...iv ...
Page 6: ...vi ...
Page 10: ......
Page 14: ...xiv ...
Page 180: ...158 One to one PC Link I O Response Time Section 7 4 ...
Page 222: ...200 Programming Example Section 8 3 ...
Page 250: ......
Page 256: ......
Page 258: ......
Page 260: ...238 Support Software Appendix C ...
Page 268: ......