
209
Troubleshooting Flowcharts
Section 9-5
Power Supply Check
PWR indicator not lit.
Replace the CPU
Unit.
Is power being
supplied?
Is voltage adequate?
Are there any discon-
nected connectors or
broken wires?
Connect power
supply.
Is PWR indicator lit?
Set supply voltage
within acceptable limits.
Is PWR indicator lit?
Connect connectors
or replace wires.
End
Yes
No
No
Yes
Yes
No
No
No
Is PWR indicator lit?
Yes
No
Yes
Yes
Summary of Contents for CPM2C-S100C
Page 2: ......
Page 3: ...CPM2C S Programmable Controller Operation Manual Revised September 2009 ...
Page 4: ...iv ...
Page 6: ...vi ...
Page 10: ......
Page 14: ...xiv ...
Page 180: ...158 One to one PC Link I O Response Time Section 7 4 ...
Page 222: ...200 Programming Example Section 8 3 ...
Page 250: ......
Page 256: ......
Page 258: ......
Page 260: ...238 Support Software Appendix C ...
Page 268: ......