
3-2
Operation Indicators
The Programmable Multi-Axis Controller is equipped with indicators to show the current operations
status of the Unit.
(A)
(B)
(C)
(D)
(E)
(F)
(G)
The operating statuses corresponding to the colors and statuses of the indicators are shown below.
Letter
Indicator
Color
Status
Description
(A)
DIAG.MODE
Green
Lit
Not used.
(B)
ECAT LINK
Orange
Lit
The EtherCAT link is established.
Not lit
The EtherCAT link is not established.
(C)
ECAT ACT
Yellow
Lit
The EtherCAT link is established.
Flashing
Data communications are in progress after the Ether-
CAT link is established.
Flashes every time data is sent or received.
Not lit
The EtherCAT link is not established.
(D)
Ethernet LINK Green/
Orange
Lit in green
The Ethernet link is established at 1 Gbps.
Lit in orange The Ethernet link is established at 100 Mbps.
Not lit
The Ethernet link is not established.
(E)
Ethernet ACT
Yellow
Lit
The Ethernet link is established.
Flashing
Data communications are in progress after the Ethernet
link is established.
Flashes every time data is sent or received.
Not lit
The Ethernet link is not established.
(F)
PWR/ERR
Green/Red
Lit in green
Power is supplied to the Unit.
Lit in red
Watchdog error or another hardware error
Not lit
Power is not supplied to the Unit.
3 Part Names and Functions
3-3
CK3E-series Programmable Multi-Axis Controller User’s Manual Hardware (I610)
3-2 Operation Indicators
3
Summary of Contents for CK3E Series
Page 6: ...Manual Structure 4 CK3E series Programmable Multi Axis Controller User s Manual Hardware I610 ...
Page 110: ...Appendices A 12 CK3E series Programmable Multi Axis Controller User s Manual Hardware I610 ...
Page 111: ...I Index I 1 CK3E series Programmable Multi Axis Controller User s Manual Hardware I610 I ...
Page 113: ......