CJ-series ID Sensor Units
Operating Procedure
The operating procedure for an ID Sensor Unit is shown in the following flowchart.
• When using CX-Programmer V3.0 or later with the CJ1W-V680C12, “I” will be displayed before addresses for inputs in the
ladder diagram and “Q” will be displayed before addresses for outputs for operation data. In the CX-Programmer’s I/O Table
Window, select SIOU/C200H ASCII Unit (A) and then, from the Enter SIOU Details Window, set the Address per Unit to 2, the
Input Words to 3, and the Output Words to 7, and select the Repeat IN/OUT for each Address per Unit option.
• When using CX-Programmer V2.0 or later with the CJ1W-V680C11, “I” will be displayed in the ladder diagram before address
for inputs and “Q” will be displayed before addresses for outputs for operation data.
Installation and settings
Set switch on front of Unit
Wire
Set unit number
Turn ON PLC power
Create I/O tables
Set words allocated in DM Area
Turn PLC power OFF and ON
• Turn OFF the test switch on the front of the Unit.
• OR, turn ON Special I/O Unit Restart Bit.
• Set unit number switches on front of Unit.
T
rail oper
ation
Set switch on front of Unit
Test communications
Change DIP switch on front of Unit
• Turn ON the test switch on the front of the Unit.
• Place PLC in PROGRAM mode.
• OR, turn ON Special I/O Unit Restart Bit.
Turn ON PLC power
Ladder program operation
Oper
ation
• System Settings
• Auto Wait Time Setting
• Write Protection Setting
• Antenna Connection Setting
• Results Monitor Output
• Test Settings
• Run/Test Switching Method Setting