Page 2: ...to monitor their systems remotely The device can distinguish between single phase and three phase inverters automatically and indicate current status from LEDs on its front panel By connecting with in...

Page 3: ...sol GPRS KIT User Manual 7 1 Unpack 7 2 Installation of SIM card 7 3 Installation of the data collector 7 4 Connecting data collector and PV inverter 9 5 Debugging 11 6 Register the login website 14 7...

Page 4: ...manual version V2 3 4 Part 1 485 Card Install SOP 1 Disassembly Picture 1 1 Unscrew the four screws on the interface panel with the screwdriver as shown in Picture1 1 and keep the screws aside Picture...

Page 5: ...s shown in Picture1 2 1 3 2 Install Pick out the net cable and the water proofing connector from the package and follow the Picture2 1 A put the net cable in from the gap as shown in Picture2 1 B then...

Page 6: ...User manual version V2 3 6 Insert the 485 card lightly from the position showed in Picture2 2 A Picture 2 2 Finish the installation see Picture2 3 Picture2 3...

Page 7: ...n use it directly without any more operation you are advised to use a manufacturer original SIM card 2 2 If you use a SIM card bought by yourself there would be two cases 1 If SIM card enables PIN cod...

Page 8: ...t also should avoid the sunshine What s more as metal construction would have shielding effect on wireless signal the data collector antenna should be far away from the other metal construction for at...

Page 9: ...ion A RS485 422 interface B SIM card interface C Power adapter interface D Antenna interface Pin NO RS485 RS422 1 NC NC 2 NC NC 3 NC RX 4 A TX 5 B TX 6 NC RX 7 GND GND 8 GND GND Picture 3 Picture 4 Li...

Page 10: ...r and plug into the outlet and turn the inverter switch on 4 2 2 Multiple inverter connection 1 cut off the power of the inverter 2 Plug one end of the network cable into any RJ45 port of any one inve...

Page 11: ...LEDs are On LINK and 485 422 LEDs are On or blinking If after the system has been powered on for 1 minute the 4 indicators are not in the above status please solve the problem according to below comm...

Page 12: ...wire is right and make sure the connecting wire is according to T568B line sequence Please use professional network cable tester to test Make sure the stability of the RJ 45 connector Make sure the in...

Page 13: ...nt owes a fee please recharge the account SIM card is a card abroad not China Please contact the manufacturer customer service on on off on Fail to connect with the remote server Please contact the ma...

Page 14: ...cture 6 1 click register and enter the register interface fill in and submit the document according to the demand After the user s information upload onto the server and the register finishes successf...

Page 15: ...er the configure interface Remarks please read the Omnik service agreement carefully the enclosure is the cost list for all the countries please choose your operators Owner means the final user Click...

Page 16: ...essful register and account activation open the login interface as below picture 7 1 input the correct email and code and enter the PV monitoring system then you can monitor and manage the power stati...

Page 17: ...User manual version V2 3 17 7 1 Owner User Interface Picture 7 2 Picture 7 1 Input the correct email and code Power station list...

Page 18: ...enter Edit or delete the case Not yet open Back to 7 2 interface Enter the sharing case Enter the configure company account interface Add one case under your account same as 7 3 Picture 7 3 List of p...

Page 19: ...ser manual version V2 3 19 Picture 7 5 Main interface of power station Change case Case info search Power station info Energy saving Real time power and generated energy switchover Print current figur...

Page 20: ...User manual version V2 3 20 Picture 7 6 Real Time Interface Internal temperature Latest data collecting time Picture 7 7 History Interface Parameter options Choose the aim inverter...

Page 21: ...User manual version V2 3 21 Picture 7 8 Alert Interfaces Click turn to picture 7 7 Picture 7 9 System Setting Interface The interface same as picture 7 3...

Page 22: ...ad the Omnik solar iPhone and Omnik Solar HD iPad at app store After the download input your user name and password then visit your station we supply a free demo for the users who do not register choo...

Page 23: ...User manual version V2 3 23 Picture 8 1 1 Log in interface 2 Power station list interface 3 Main interface 4 Daytime curve interface...

Page 24: ...contact us you should confirm the follow things before contact us Device model Data collector serial number The number of connected inverter Omnik New Energy Co Ltd Add Xinghu Road No 218 bioBAY Park...