Omicron CPC 100 Getting Started Download Page 11

OMICRON

11

Introduction

2

Introduction

2.1

Designated use

2.1.1

CPC 100

The

 CPC 100

, with its accessories or as a stand-alone unit, is a multi-purpose primary test set for 

commissioning and maintaining substation equipment. It performs current transformer (CT), voltage 
transformer (VT) and power transformer (TR) tests and is used for contact and winding resistance 
testing, polarity checks, and for primary and secondary protection relay testing.

2.1.2

CPC 80

The 

CPC 80

 is a control unit based on the 

CPC 100 

hardware concept. In contrast to the 

CPC 100

 the 

CPC 80

 only comes with the booster output. It is not equipped with any measurement inputs or directly 

usable outputs and therefore intended for use with 

CPC

 accessories for testing.

Currently the 

CPC 80

 is used in the following combinations:

• With the 

CP TD

 for dissipation/power factor testing

• As slave unit with a 

CPC 100 

as master

As mentioned above, dedicated accessories are required to allow for dedicated testing. The 
synchronization of 

CPC 

devices affects various applications as it allows for increased testing power.

2.2

Options for operation

► The 

CPC 100

 and 

CPC 80

 can be operated via either the front-panel control or 

Primary Test 

Manager

.

Summary of Contents for CPC 100

Page 1: ...CPC Getting Started...

Page 2: ...ta embodied in this manual represent the technical status at the time of writing and are subject to change without prior notice We have done our best to ensure that the information given in this manua...

Page 3: ...d the regulations on site 1 2 Safety standards and rules 1 2 1 Safety standards Testing with the CPC must comply with the internal safety instructions and additional safety relevant documents In addit...

Page 4: ...yee of the utility Turn off and disconnect the high voltage from the test object Protect yourself and your working environment against an accidental re connection of high voltage by other persons and...

Page 5: ...o the grounding system on site This also applies to all other test devices and accessories in the test setup Make sure that the grounding clamp has a good electrical contact to the grounding system on...

Page 6: ...the equipotential ground or PE of the generator has to be grounded properly If this is not possible measurements are not permitted and cannot be performed Additional information Instead of supplying t...

Page 7: ...e to be connected to the CPC 100 do not carry any voltage potential During a test the only power source for a test Make sure that the ground terminal of the device under test is in good condition clea...

Page 8: ...t amount of heat approx 300 W m at 800 A After operation wait for cables and clamps to cool down before touching them If in doubt wear gloves Never use the test cards Quick and Resistance to measure t...

Page 9: ...nues the monitoring of the discharge status before the test object might be completely discharged The CPC displays an error message and a green light in this case This could erroneously be interpreted...

Page 10: ...struction manual may cause harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be require...

Page 11: ...100 hardware concept In contrast to the CPC 100 the CPC 80 only comes with the booster output It is not equipped with any measurement inputs or directly usable outputs and therefore intended for use w...

Page 12: ...anel control Fuses for 6A AC and 6A DC outputs Navigation elements Test Start Stop Soft touch keyboard Key lock BIN IN Binary trigger input Emergency stop button I O Status lights INPUT Measuring inpu...

Page 13: ...Figure 3 4 Left side view of the CPC 80 ePC with front panel control Key lock I O Status lights Soft touch keyboard Navigation elements Test Start Stop Emergency stop button External booster Groundin...

Page 14: ...mains Table 3 1 Status lights 1 Output is switched OFF Green status light 0 on Current voltage source is inactive off 2 Output is switched ON and or measurement process is active Red status light I is...

Page 15: ...r is always galvanically connected to mains This also applies when no external booster is selected the green status light 0 is on the outputs are turned off or the Emergency Stop button is pressed Han...

Page 16: ...00 and CPC 80 USB connector Connector for OMICRON safety accessories RJ 45 socket for connection to a PC or a network hub Yellow LED Data are being transferred from to the network Green LED CPC connec...

Page 17: ...test object according to your requirements 5 Set up a barrier to separate the high voltage area from the work area see Figure 1 1 Separation of work area and high voltage test area on page 9 6 Remove...

Page 18: ...for the first time a warning message appears on the screen Only after the I O test start stop push button is pressed a second time the voltage is applied to the CPC output An error message 313 appears...

Page 19: ...the CPC and the test object 5 Remove the barrier 4 2 Cleaning Use a cloth dampened with isopropanol alcohol to clean CPC and its accessories WARNING Death or severe injury caused by high voltage or c...

Page 20: ...CPC Getting Started 20 OMICRON...

Page 21: ...3 59495 4444 Additionally you can find our Service Center or Sales Partner closest to you at www omicronenergy com Customer Portal stay informed www omicronenergy com customer The Customer Portal on o...

Page 22: ...ENU 1194 03 04...

Reviews: