4
Before you begin the assembly open all the
panels from their individual wrapping to iden'-
fy the panels properly . Be sure to open them
in a way that will not scratch the panels.
Step 1:
a) Begin by taking surface panel #C and lay it on a clean,
so$ surface facing down with the holes facing up-
wards.
b) Locate side panels #A and B
c) Make sure that both panels have the screw assembly
tabs facing inwards as shown. Slo8ed edges of the
side panels should be posioned on panel #C on the
side opposite the grommet hole as shown.
d) Use six bolts #1, three for each panel, to secure the
side panels to the surface as shown. Screw the three
bolts through the holes on the top of the side panels
and into the T-nuts on panel #C.
e) Use the provided hex key, part #11 to ghten the
bolt in place.
Step 2:
a) Locate projector shelf panel #D and place it between
the two side panels, just above panel #C, facing down
with the embedded T-nuts facing up. Li$ the panel
up unl the panel is flush with the four tabs on the
side panels as shown.
b) The T-nuts in the panel should be aligned with the
holes in the four mounng tabs.
c) Be sure to have shelf panel #D flush with the edges of
the side panel at the slo8ed side of the side panels as
shown. The extended end of the panel should pro-
trude at the other end of the unit as shown,
d) Once aligned use four bolts #13 to secure the shelf to
the tabs. Screw the four bolts through the holes on
the tab and into the T-nuts on panel #D.
e)
f)
Use the provided hex key, part #11 to ghten the
bolt in place.
STEP 1
STEP 2
Grommet
Extended End
Flush
Slots on edge
No grommet
hole