OHAUS VX Series Instruction Manual Download Page 1

 

 

 
 

 

 

VX Series Floor Scale 

 

 

Instruction Manual 

 

 
 
 
 
 

 

 

 

Summary of Contents for VX Series

Page 1: ...VX Series Floor Scale Instruction Manual...

Page 2: ......

Page 3: ...4 Foot Plates 2 2 5 Cable Installation 2 2 6 Legal for Trade Sealing 4 3 OPERATION 5 3 1 Operating Limits 5 4 MAINTENANCE 5 4 1 Daily Checks 5 4 2 Cleaning 5 5 TECHNICAL DATA 6 5 1 Specifications 6 5...

Page 4: ......

Page 5: ...are kept to a minimum This applies also when the floor scale is integrated into conveying systems 2 INSTALLATION CAUTION THE FLOOR SCALE PLATFORM IS VERY HEAVY ALWAYS USE APPROPRIATE HOISTING EQUIPME...

Page 6: ...n adjustment is needed first loosen the 3 4 jam nut near the top of the foot and rotate the bottom section of the foot After adjusting retighten the jam nuts Recheck that all 4 feet are still in full...

Page 7: ...label instead 7 After making all connections make a record of the wire color to signal names This information will be needed when connecting the Indicator to the other end of the cable 8 Route the oth...

Page 8: ...lation instructions of the Indicator to properly connect the cable wires to the Indicator 5 Use the recorded wire color information from the platform connections to make the proper wire connections 2...

Page 9: ...VX5000L VX5000X 5 000 lb 2 265 kg 5 000 lb 2 265 kg 2 500 lb 1 130 kg VX10000L VX10000X 10 000 lb 4 530 kg 10 000 lb 4 530 kg 5 000 lb 2 265 kg 4 MAINTENANCE 4 1 Daily Checks Check that the feet are...

Page 10: ...b Load Cell 4 x Shear Beam IP67 Nickel plated alloy steel NTEP C3 Load Cell Output Impedance 350 3 Load Cell Excitation Voltage 5V 15V DC AC Junction Box Side panel access IP65 plastic case 25 7 6m ca...

Page 11: ...DELS DIMENSIONS FLOOR SCALE PLATFORM FOOT CENTERS A H nominal W L VX2500L VX5000L 4 1 219 mm 4 5 114 mm 42 5 1 080 mm 42 5 1 080 mm VX5000X 5 1 524 mm 4 5 114 mm 54 5 1 384 mm 54 5 1 384 mm VX10000L 4...

Page 12: ...arrangement provides optimal prevention of platform movement 4 Before tightening the expanding bolts pretest the installation by temporarily positioning the platform over the foot holes 5 When proper...

Page 13: ...A was awarded a certificate of registration to ISO 9001 by Bureau Veritus Quality International BVQI confirming that the Ohaus quality management system is compliant with the ISO 9001 standard s requi...

Page 14: ...as been damaged by accident or misuse exposed to radioactive or corrosive materials has foreign material penetrating to the inside of the product or as a result of service or modification by other tha...

Page 15: ......

Page 16: ......

Page 17: ...ration 7 Campus Drive Suite 310 Parsippany NJ 07054 USA Tel 973 377 9000 Fax 973 944 7177 www ohaus com With offices worldwide 80252765 P N 80252765 B 2011 Ohaus Corporation all rights reserved Printe...

Reviews: