OHAUS T31P Quick Start Manual Download Page 1

Quick Start Guide 

 

T31 Indicators

 

Ohaus Corporation  www.ohaus.com 

 

i

 

T31 Indicators

 Quick Start Guide 

ASSEMBLY 

Both the T31P and T31XW connect to a scale base through a Load Cell Cable that connects to 
the Indicator’s Main Printed Circuit Board (PCB). Follow these connection instructions. 

Load Cell cable connections are on the rear of both models: 

T31P

 (rear view) 

 

T31XW

 (rear view) 

 

 

 

Remove the four screws from the Bottom Housing. Separate the Top and Bottom Housing.  

Connect the Load Cell cable leads to Load Cell Terminal J5 on the T31’s Main Printed Circuit 
Board. (Note Jumpers W1 and W2.  RS232 terminals and LFT Switch are also shown.) 

OFF

ON

J7           J6

J5

W1                           W2

J4

 

Printed Circuit Board (PCB), T31 Indicator 

Jumper Connections 

For a 4-wire load cell with no sense wires, short Jumpers W1 and W2. 

For a 6-wire load cell that includes sense wires, open Jumpers W1 and W2. 

For load cells with an extra ground shield wire, connect the shield to the center position (GND).

 

+EXC      +SIG     -SIG     -EXC

      +SENS    GND     -SENS

 

Load Cell wiring. 

Pin     Connection 

J5-1     +Excitation 
J5-2     +Sense 
J5-3     +Signal 
J5-4     GND 
J5-5     –Signal 
J5-6     –Sense 
J5-7     –Excitation 
 

 

Open/shorted jumpers. 

Re-assemble the Top and Bottom Housing. 

Load Cell 

Terminal J5 

Sense 

Jumper W1 

Sense 

Jumper W2 

LFT On/Off 

Switch 

RS232 

Terminal J6 

(T31P only) 

RS232 

Terminal J7 

(T31XW only) 

Power 

Receptacle 

Strain relief for 

Load Cell Cable 

RS232 

Connector 

Strain relief for 

Power Cable 

Strain relief for 

Load Cell Cable 

Strain relief for 

RS232 Cable 

Reviews: