21
Defender
™ Series Bases Service Manual
4.5.3 Full Load Test
1.
After the Off Center Load Test has been passed, test the Base’s full capacity according to
the Specification Table 1-1. The Base must meet all specifications as listed.
2. If the Base fails the Full Load Test, check and set the Down Stops.
(See Section 3.3.)
This section of the manual contains exploded views for the Defender E Bases. The exploded view drawings
are designed to identify the parts which can be serviced in the field.
ATTENTION: In all cases where a part is replaced, the base must be thoroughly checked after
the replacement is made. The base
MUST
meet the parameters of all applicable
specifications in this manual.
If further technical information is needed, please contact your local Ohaus office, or:
Ohaus Corporation
7 Campus Drive, Suite 310
Parsippany, NL 07054, USA
Tel: +1 973-377-9000
Fax: +1 973-944-7177
In the United States call toll free, 800-672-7722 ext. 7852 between 8:00 a.m. and 5:00 p.m. EST.