background image

Quick Start Guide 

 

CKW-55 Indicator 

Ohaus Corporation  www.ohaus.com 

 

i

 

CKW-55 Indicator

 Quick Start Guide 

 

CAUTION: Disconnect power before opening indicator.

 

ASSEMBLY 

The Indicator housing has liquid-tight cable 
connectors for load cell, communication (I/O), 
and AC power, as shown.  

To open the housing, remove two screws on 
either side, and gently fold the front panel away 
from the rear panel. 

Pass the load cell cable through the liquid-tight 
connector and the large ferrite bead attached to 
a plastic clip. Remove the screws holding the 
switch cover plate. Connect the load cell cable 
and wires as indicated on the diagram below.

 

 

 

Adjust Jumpers to match the load cell:

 

For a 2 mv/v load cell: short W1. 
For a 3 mv/v load cell: open W1. 
For a 4-wire load cell with no sense wires: 
short both W2 and W3. For a 6-wire load cell 
with sense wires, open W2 and W3. 
For a load cell with an extra ground shield 
wire, connect the shield wire to “GND” on J2. 

 

Mount the Indicator on its Wall/Table Bracket 

 

Mount to a vertical or horizontal solid surface.  
(Hardware not supplied.) Adjust angle, then tighten knobs.  
 

 

Safety precautions: 

 

  Be sure local power supply matches input 

voltage printed on Indicator label. 

  Be sure the power cord does not pose an 

obstacle or tripping hazard. 

  Disconnect the product when cleaning. 

  Do not operate this product in hazardous or 

unstable environments. 

  Use only approved accessories and 

peripherals. 

  Operate the product only under ambient 

conditions specified in the Instruction 
Manual. 

  Service should be performed by 

authorized personnel only. 

 

Reviews: