OPM223/253
Installation
9
3.2
Incoming acceptance, transport, storage
• Make sure the packaging is undamaged!
Inform the supplier about damage to the packaging.
Keep the damaged packaging until the matter has been settled.
• Make sure the contents are undamaged!
Inform the supplier about damage to the delivery contents.
Keep the damaged products until the matter has been settled.
• Check that the scope of delivery is complete and agrees with your order and the
shipping documents.
• The packaging material used to store or to transport the product must provide shock
protection and humidity protection. The original packaging offers the best protection. Also,
keep to the approved ambient conditions (see "Technical data").
• If you have any questions, please contact your supplier or your sales centre responsible.
3.3
Installation conditions
3.3.1
Field instrument
C07-OxM253xx-06-06-00-en-001.EPS
Fig. 2:
Field instrument
!
Note!
There is a hole in the punching for the cable entry (connection of supply voltage). It serves as
a pressure balance during air freight dispatching. Make sure no moisture penetrates the inside
of the housing before the cable installation. The housing is completely air-tight after the cable
installation.
CAL
REL
REL 1
REL 1
ALARM
REL 2
REL 2
E
Pg 7
Pg 16
M 5
11/
0.43
Ø 6 /
Ø 0.24
115 / 4.53
157 / 6.18
247 / 9.72
70 / 2.76
70 / 2.76
154 / 6.06
170 / 6.69
mm / inch
Pg 13.5
Summary of Contents for OPM223
Page 2: ......
Page 95: ...OPM223 253 Technical data 95...
Page 100: ...Appendix OPM223 253 100...
Page 103: ...OPM223 253 103...
Page 104: ...BA194e 00 07 09 71106576 Printed in Germany FM SGML 6 0 DT 71106576...