
OEC 9800 Periodic Maintenance Procedure
16
FluoroTrak
Articulating-Arm (Option)
1.
Verify that the articulating-arm mechanics move freely and smoothly throughout the entire range of motion. Adjust
the articulating arm’s friction brake if necessary.
2.
Verify that the articulating-arm mechanics have negligible mechanical drift. Adjust the friction brake and/or
mechanical assemblies if necessary.