The RPG-HC4 regulators are arranged on top of a hydrophore tank by means of flanges that are connected to 

pipes that directs incoming gas into the upper part of the tank. The gas is supplied to each RPG-HC4 regulator 

by means of fittings with 1" NPT threads.  

Importance notice regarding operational use:   

Due to the fact that these regulators have extreme capacity, the downstream pipe run for each RPG-HC4 

connection must never be blocked.  

The regulator shall be put in operation by slow opening of the shut-off valves that are connected upstream each 

RPG-HC4. 

Optimal function of the RPG-HC4 is obtained when the downstream pressure is higher or equal to pre-set level. 

The regulator is then in the closed position. If pressure in the AHS drops below set pressure, the regulator will 

respond almost instantly and open for air supply to sustain the set pressure. 

It shall not be necessary to change the terms of RPG-HC4 during operation. When something indicates that 

RPG-HC4 has a malfunction, contact OBS Technology AS for service.  

3  M

AINTENANCE

 

 

No maintenance performed at site. We recommended that each RPG-HC4 unit that are in operational use 

should be sent to OBS Technology AS for maintenance first time after 18 months, then every third year. 

NB! Use the original aluminum box for transport to prevent damage to the o-ring against the flange. 

 

NB! 

   Adjustments on the RPG-HC4 should be done at OBS’s premises. Special test facilities are required to 

do adjustments and verify proper function. Tampering by un-authorized personnel can cause hazardous 

flow conditions that can harm the firewater system as well as personnel. 

 

 

 

 

 

 

The service will include the following steps:  

Service tasks 

Internal procedure 

Testing in rig prior to disassembly 

RPG-HC4-P06-MK-000191 

Maintenance incl. complete disassembly, cleaning and inspection of all 

parts, replacement of all O-rings and Pilot Valve (art.no01-00378). 

RPG-HC4-P06-MK-000191 

OBS-P06-KA-000157

 

Re-Assembly  

OBS-P06-KM-000159 

Final test RPG-HC4 (functional testing in the test rig) 

RPG-HC4-P06-KC-000191 

Fill in Service Report   

WOXXXX-HC4-P04-RB 

  