13
1. GENERAL SAFETY
The O.ERRE considers the safety and proper operation of the product only if the electrical system
and the power of the place of installation complies with current regulations and if the product is
installed and used according to the rules described below.
2. LIFTING INSTRUCTIONS
The load during both the charging and discharging , should always be lifted from the base of the
product by means of a crane or forklift with adequate capacity to support the weight , do not turn
it or place on the sides and submit to strong shock. The product is supplied with a suitable pro-
tective packaging that provides only shelter from dust and scratches the surface , it is advisable to
protect it from the elements. Take all precautions required by safety regulations to avoid possible
damage to persons or property.
3. INSTALLATION INSTRUCTIONS
The horizontal version can only be installed in the ceiling with support brackets or shelves and the
accessibility for periodic maintenance is permitted by the doors positioned downwards. Is neces-
sary to provide additional later space (space of respect). The ground positioning can be made only
with the vertical version that is provided with appropriate support legs and inspections are carried
out from the front. The installation of the machine, as well as the appropriate electrical connections
to ducts and fittings must be performed by skilled technicians in the industry. The machine also
requires a space environment free of obstacles and enabling the smooth opening of the doors of
inspection as well as enough space for the extraction of the filters and the electrical wiring of the
fans. The following is possible modes of fixing of the heat recovery unit . We emphasize that the
anchor points and the dimensioning of the brackets must be made from time to time in respect of
the plant situation and dimensioning of the static and dynamic system.