background image

(Fig. 1)

Removal position

Setting the flow rate

(Fig. 6)

(Fig. 7)

NYOS

®

 TORQ

® 

G2 QUICK START

Step 01 

Positioning the TORQ

® 

G2 Dock in the sump

•  In sump use only 

•  Avoid contact to side panes

•  Only plug in, when the body is on the 

dock

Full instructions and safety information

Video instructions and tips

Step 03 

Insert TORQ

® 

G2 Body and start operation

1.  Fit the body on the dock in the removal position 

(Fig. 6)

2.  Plug in the dock

3.  It is possible to change the flow rate by rotating 

the body (Fig. 7)

4.  Set the flow rate so that the filter media will be 

hold in suspense

NOTE: 

A smear layer will form after a few days. 

This will result in a quieter return flow and bubble 
formation will reduce.  

Manufactured by  
Nyos

®

 Aquatics GmbH 

Siemensstr. 26
70825 Korntal-Muenchingen, Germany
www.nyos.info, [email protected]

EN

Reviews: